Friday, March 15, 2019
Week 24: Exterior Detailing
George, Grant and I spent a few meetings this week going over the complex exterior detailing. This house will not be a simplified task of simply installing siding. George has to do a LOT of aluminum rim details, both to accentuate window and corner details, but also to make sure we accommodate the change from the North/South wall cladding (different because of the requirement to be non-combustible) and the East/West wall cladding). It's going to be great, but I think George has had some sleepless nights - a good sign that he is a consummate professional.
Subscribe to:
Post Comments (Atom)
-
This week was waterproofing in the basement. The clients chose to do interior water proofing, as the water table and foundation indicate wa...
-
As Thom finished some of the brick patching in the front, Miguel finished up and managed to get the roof on before going on vacation for Ch...
-
George, Grant and I spent a few meetings this week going over the complex exterior detailing. This house will not be a simplified task of s...
No comments:
Post a Comment