Friday, March 29, 2019

Week 26: Drywall boarding starts

Drywall started this week!  Although we cannot complete all the boarding (the client has chosen to go with drywall reveals around the doors, so the doors need to be installed 100% before all the drywall can be done), we should be able to finish 90% of the house.





Friday, March 22, 2019

Week 25: Insulation

The insulation arrived today.  The client has chosen to go mostly with Roxul insulation both for the interior and exterior requirement for Continuous Insulation (CI).  Roxul is more expensive, harder to install, but does provide some resistance to fire.





Friday, March 15, 2019

Week 24: Exterior Detailing

George, Grant and I spent a few meetings this week going over the complex exterior detailing.  This house will not be a simplified task of simply installing siding.  George has to do a LOT of aluminum rim details, both to accentuate window and corner details, but also to make sure we accommodate the change from the North/South wall cladding (different because of the requirement to be non-combustible) and the East/West wall cladding).  It's going to be great, but I think George has had some sleepless nights - a good sign that he is a consummate professional.




Friday, March 8, 2019

Week 23: Keeping watch

George pointed out the coolest little owl sitting under the office floor outside, keeping watch on us as we cleaned the front of the house and yard up.  Beautiful!


Friday, March 1, 2019

Week 22: Water and Electrical Services

Odds and ends week!  Tony was in to install the meter and get the meter sealed and inspected by the city.  At the same time, Kevin scheduled the new service to be installed and we dismantled the old electricity service on the North side of the house.



Week 48: Move in day