Kevin and Josh have been working away on the 2nd floor electrical plan (now that HVAC is finished up there), as well as preparing for the movement of the service to the other side of the house. It will now be located in the bonus storage room behind the garage. Bonus because the plans called for a crawlspace, but by the time we got below the frost level, it was a better idea to make the room a fully functional storage space.