Friday, January 11, 2019
Week 15: Basement concrete
Daniel from Fosscon prepped the basement floor by doing some more leveling and installing the 2" rigid insulation and vapour barrier. The next day, he poured the basement floor. Ahh... clean, warm and cozy down there now!