Friday, January 11, 2019

Week 15: Basement concrete

Daniel from Fosscon prepped the basement floor by doing some more leveling and installing the 2" rigid insulation and vapour barrier.  The next day, he poured the basement floor.  Ahh... clean, warm and cozy down there now!



No comments:

Post a Comment

Week 48: Move in day